Third Party Inspection (TPI) for every manufacturing industry

Nothing ships until we’ve seen it.

Whatever you are having made — DC fans, drones, toys, fabricated structures, machinery — Velnark stands on the manufacturer’s shop floor for you. Manufacturing is our core strength, whatever the product. Every photo, video and reading lands in one traceable record you can open from anywhere.

DC fan manufacturingDrone manufacturingToys manufacturingFabricationMachineryand every other industry
  • Inspector at the gate in 48 hours
  • Signed report within 24 hours of site exit
  • One permanent record per project
Project 4471-A · Item 04
Quadcopter / UAV frame assembly
1 punch open
Factory acceptance testITP 4.2 · 18 Apr
Hover & stability test
Motor thrust bench
Return-to-home test
PUNCH
Position hold — punch #14
  • Hover endurance24 min (spec 22) — passed
  • Position holdDrifts > 2 m in 6 m/s wind
  • Thrust per motor1,180 g at 100% throttle
Witnessed test sheetsInstrument calibration records
34 photos · 3 videos · 5 docsOne permanent link

Go ahead — press a stage. The record follows.

Illustrative record. Example data, shown to demonstrate the format.

ASME Sec. VIII Div. 1EN 10204 3.1 / 3.2ASME Sec. IXAPI 6DASME B31.3NACE MR0175ASTM A234IS 2062AWS D1.1IBR 1950PED 2014/68/EUIEC 60529IEC 61439API 610ASME Sec. VIII Div. 1EN 10204 3.1 / 3.2ASME Sec. IXAPI 6DASME B31.3NACE MR0175ASTM A234IS 2062AWS D1.1IBR 1950PED 2014/68/EUIEC 60529IEC 61439API 610

About Velnark

Manufacturing is what we know. The product can be anything.

Velnark provides Third Party Inspection (TPI) for any type of manufacturing industry. Our strength is the manufacturing process itself — how material comes in, how parts are made and assembled, how the finished product is tested and packed — and that skill carries across products.

So whether the line is making DC fans, drones, toys, fabricated structures, machinery, electronics or automotive components, we understand the process well enough to see where it is about to go wrong, and to say so with the evidence attached.

  • Process first

    We inspect how it is made, not only what came out at the end.

  • Independent

    We work for the buyer, never for the manufacturer.

  • Evidence attached

    Every finding carries the photograph or reading that proves it.

Where we stand on the floor

  • DC fan manufacturing
    Motors, impellers, housings, drives
  • Drone manufacturing
    Frames, motors and ESCs, flight controllers, batteries
  • Toys manufacturing
    Moulded parts, electronics, assembly, safety labelling
  • Fabrication
    Structures, enclosures, skids, weldments
  • Machinery
    Special-purpose machines, pumps, compressors, conveyors
  • Electronics
    PCB assemblies, control panels, power supplies, LED
  • Automotive components
    Castings, machined parts, harnesses, trims

We provide TPI for every type of industry.

Tell us what you are having made

Services

Every gate between the order and the truck.

Six services. Take the whole chain, or just the stage that worries you.

Stage 01

Raw Material Inspection

Verify the inputs before they become the product.

Specification compliance matrix · Lot and batch traceability record · Marking and batch photographs

Stage 02

In-process Inspection

Catch it while it is still fixable.

ITP hold-point sign-off · Dimensional and process check records · Sub-assembly stage photographs

Stage 03

Final Inspection

The finished product, checked end to end.

Final inspection report with readings · Dimensional and visual check sheet · Function and operation check record

Stage 04

FAT (Factory Acceptance Test)

Witnessed properly, recorded fully.

Witnessed test sheets · Test instrument calibration records · Performance vs. datasheet

Stage 05

Pre-Dispatch Inspection

The last gate before it leaves.

Packing, marking and lashing check · Nameplate and label verification · Preservation and finish check

Any time

Vendor Assessment & Development

Before you commit — and after.

Scored capability report · Calibration register review · Sub-vendor chain map

Built for

DC fan manufacturingDrone manufacturingToys manufacturingFabricationMachineryElectronicsAutomotive components

We provide TPI for every type of industry.

Also

Water & wastewater treatmentPower generationOil, gas & petrochemicalPharma & clean utilitiesInfrastructure & steelRenewablesFood & beverageMining & bulk handling
Not on the list? Ask anyway

The Evidence Vault

Most inspection reports die in an inbox.

Ours doesn’t. Everything captured on site is written into one living record for that project — and it stays there, in full resolution, for as long as you need it.

  • Full-resolution photos and unclipped video of every test run
  • Punch points with a named owner, a date, and the evidence that closed them
  • One permanent link per project — searchable for as long as you need it
Start with one project

What usually arrives

A 9-page PDF. Six compressed photos. “Witnessed and found satisfactory.”

What you get instead

A live record: every file, every reading, every punch point — traceable to the clause it satisfies.

0 h
Inspector at the vendor's gate
0 h
Signed report after site exit
0%
Evidence linked to the project
0
Reports issued without proof

These are commitments, not statistics — we’re a new firm and won’t quote numbers we haven’t earned.

How it works

Five steps, the same every time.

  1. 01

    Scope & ITP

    You send the project details, drawings and spec. We return a stamped ITP.

  2. 02

    Notify & mobilise

    The manufacturer raises the call. We confirm the inspector and are at the gate in 48 hours.

  3. 03

    Inspect & capture

    Everything is captured as it happens — photos, video, readings, raw data.

  4. 04

    Report & disposition

    Signed report in 24 hours, with a clear disposition and an owner on every point.

  5. 05

    Release & archive

    Release note issued, dossier sealed and linked to the project for good.

Start with one project

Tell us what’s being built, and where.

Send the project details, the drawings and the delivery date. You get a proposed ITP and a fixed quotation, usually within one working day.

  • One project is enough to start — no retainer
  • NDA signed before you share drawings
  • Fixed quote against a defined scope

Prefer email? umais@velnark.in

Services required

We sign an NDA before you share drawings. Your details never reach a vendor.